Gas-insulated direct current lines instead of power lines for the energy revolution?
The interior of the new 500 kV DC high voltage hall during the construction phase. The left blue column is the 1.2 MV DC generator.
(Picture: Gregor Rynkowski / TU Darmstadt)
5/15 Back to the Article